Saturday, August 28, 2010

32kg Heavy Swing (1-H)

32kg Swing x 20 on the minute x 17.
Alternating ladders up and down, left and right.
(RPE 8: More volume, more effort. Swings instead of snatches because of a deep injury on my right palm below the thumb. I kept it wrapped tight and there was no pain or interference. Day two and healing fast.)

Cool Down:
Cold-Hot-Cold contrast shower.

No comments: